蒸汽江森动态平衡电动二通阀沪工阀门 上海良工 开维喜阀门 上海阀门厂家

VPF蒸汽江森动态平衡电动二通阀沪工阀门 上海良工 开维喜阀门 上海阀门厂家

参考价: 面议

具体成交价以合同协议为准
2022-06-06 10:50:02
4
产品属性
关闭
上海高茨阀门制造有限公司

上海高茨阀门制造有限公司

免费会员
收藏

组合推荐相似产品

产品简介

蒸汽江森动态平衡电动二通阀沪工阀门 上海良工 开维喜阀门 上海阀门厂家安装前请仔细阅读产品说明书,核对产品型号。
. 水流方向必须按照阀体上指示得方向相同。
3. 在用于风盘或空气处理机组管路时,阀体须位于接水盘上方,以保证出现滴水时落 入接水盘中。

详细介绍

蒸汽江森动态平衡电动二通阀沪工阀门 上海良工 开维喜阀门 上海阀门厂家动态平衡电动二通阀安装说明

蒸汽江森动态平衡电动二通阀沪工阀门 上海良工 开维喜阀门 上海阀门厂家. 安装前请仔细阅读产品说明书,核对产品型号。

. 水流方向必须按照阀体上指示得方向相同。

蒸汽江森动态平衡电动二通阀沪工阀门 上海良工 开维喜阀门 上海阀门厂家3. 在用于风盘或空气处理机组管路时,阀体须位于接水盘上方,以保证出现滴水时落 入接水盘中。

蒸汽江森动态平衡电动二通阀沪工阀门 上海良工 开维喜阀门 上海阀门厂家4. 阀体及执行器安装于垂直方向±60范围内,其上方应至少有30mm空间用于拆装。 与周围管道、设备、建筑物必须保持足够的维修操作空间,必须安装在维修人员通 过检修孔能触及到的地方。

5. 阀体安装完毕并与管路通过试压后才可安装执行器。阀前需装过滤器。

6. 所有接线需遵守和地方电气规范,执行器须避免受潮。

Instructions

. Read the instructions carefully, check the product model before installation.

. Flow direction must be identical with the direction on the valve body.

3. When used on a pipeline of fan coil or air handling units, valves shall be located above the water tray to ensure the possible drop fall into the tray.

4. The valve and actuator are recommended to be mounted within ±60 degrees of

the upright position. Above it there should be at least 30mm space for assembly and disassembly. The valve and actuator must be installed with suf?cient operating space around pipelines, equipment and buildings, and where maintenance worker can touch through the access hole.

5. The actuator can only be installed after the valve installed and pressure tested. Strainer is required before the valve.

6. All wiring must comply with local, regional, and national electrical code requirements. The actuator housing must be protected from moisture.

安装方向/Installation direction

Instructions

. Read the instructions carefully, check the product model

before installation.

. Flow direction must be identical with the direction on the valve body.

3. When used on a pipeline of fan coil or air handling units, valves shall be located above the water tray to ensure the possible drop fall into the tray.

4. The valve and actuator are recommended to be mounted within ±60 degrees of

the upright position. Above it there should be at least 30mm space for assembly and disassembly. The valve and actuator must be installed with suf?cient operating space around pipelines, equipment and buildings, and where maintenance worker can touch through the access hole.

5. The actuator can only be installed after the valve installed and pressure tested. Strainer is required before the valve.

6. All wiring must comply with local, regional, and national electrical code requirements. The actuator housing must be protected from moisture.

上一篇:角型调节阀正反安装方法及应用技巧 下一篇:电动调节阀的安装注意事项
提示

请选择您要拨打的电话: